- the parts to bring the power from underground to the breaker box
- a 40 circuit breaker box
- 3 outlets
- 1 inside light
- 1 outside light
Once that is done WE Energies will be scheduling the installation of the underground connection (200A) from the pole to the shop.
Total bill $2000. It's a lot of money but what I need to have done to get to the point I can work on it myself. The price seems in line with work done for other people so I guess I can't complain. Once again, I'm in the wrong line of work.